Show Navigation
back to search results

DSCF5507

4/15/08 -- BRUNSWICK, Maine -- Maine Dept. of Transportation (MDOT) employee Mike Landry cuts away a section of steel beam from the overpass over Route 1 at Cook's Corner on Tuesday afternoon. The bridge is being repaired because it was struck by a vehicle which exceeded the clearance of the bridge in November, 2007. MDOT Project Engineer Bill Doukas expects bridge reconstruction to be completed by Memorial Day weekend. The $500,000 project was funded entirely by the insurance settlement of the vehicle which hit the bridge. This bridge, with 14 feet seven inches of clearance, has been hit three times in the last three years according to Doukas. With this in mind MDOT is planning to add an early warning alarm system which would alert drivers of oversized vehicles if their load's height exceeded the clearance of the bridge. The system is planned to be operational by this summer. Photo by Roger S. Duncan.

Add to Cart Add to Lightbox Download
Filename
Welder.JPG
Copyright
© Duncan Photography 2008.
Image Size
3024x2016 / 3.0MB
www.rogerduncanphoto.com.Permission for publication granted to The Forecaster
2008 April Bridge Brunswick Construction Cook's Corner Forecaster Maine Spring
Contained in galleries
News Photography Outtakes, Working People
4/15/08 -- BRUNSWICK, Maine -- Maine Dept. of Transportation (MDOT) employee Mike Landry cuts away a section of steel beam from the overpass over Route 1 at Cook's Corner on Tuesday afternoon. The bridge is being repaired because it was struck by a vehicle which exceeded the clearance of the bridge in November, 2007. MDOT Project Engineer Bill Doukas expects bridge reconstruction to be completed by Memorial Day weekend. The $500,000 project was funded entirely by the insurance settlement of the vehicle which hit the bridge. This bridge, with 14 feet seven inches of clearance, has been hit three times in the last three years according to Doukas. With this in mind MDOT is planning to add an early warning alarm system which would alert drivers of oversized vehicles if their load's height exceeded the clearance of the bridge. The system is planned to be operational by this summer. Photo by Roger S. Duncan.
Prev Next
Info
  • Facebook
  • Twitter
x

Roger Duncan Photography

  • About
  • Archive of Galleries
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Contact - Ask a question - Quote
  • About Roger Duncan